We were blessed with 63 friends coming to Rose Cottage Open House, Friday, Saturday and Sunday. Everyone was very supportive and amazed.

We passed our final electrical inspection today. He noticed the electrical strip Steven had added to the desk “I didn’t see that,” he says. Also
the lights in the bedroom closets were not positioned correctly. Steven also has to change an outlet in the basement from 4 to 2. He signed our permit as passed!
The baseboard tops needed restoring. I scraped paint from the baseboards from the bedroom, steel wooled with mineral spirits. I needed also to use a drill with an attached tool to remove years of dirt engrained in the grooves.
Steven had his right hip replacement and was elated.
We are taking a break from working on the house. We are needing to heal from our surgeries. We did treat ourselves to a lovely 5 course dinner at the Como Conservatory.