We were blessed with 63 friends coming to Rose Cottage Open House, Friday, Saturday and Sunday. Everyone was very supportive and amazed.
Uncategorized
Boutique Sale
We had a boutique sale inside the house and a garage sale on the driveway. Steven began clearing items to sell or get rid of.
Holiday Party for Friends
Friends came to help clean and decorate for the party.
Break – Grand Marais Plein aire painting
Inexpensive air cleaner
We saw instructions on making an air cleaner using 4 filters, a square of cardboard, a fan, and duct tape. We had a quiet 20″ x 20″ fan we had picked up along the street. We purchased the air filters and taped. It seems to be catching a lot of dust already.
Final Electrical Inspection
We passed our final electrical inspection today. He noticed the electrical strip Steven had added to the desk “I didn’t see that,” he says. Also
the lights in the bedroom closets were not positioned correctly. Steven also has to change an outlet in the basement from 4 to 2. He signed our permit as passed!
Restoring tops for Baseboards
The baseboard tops needed restoring. I scraped paint from the baseboards from the bedroom, steel wooled with mineral spirits. I needed also to use a drill with an attached tool to remove years of dirt engrained in the grooves.
Boiler Installation
Steven’s Turn
Steven had his right hip replacement and was elated.
Valentine’s Treat
We are taking a break from working on the house. We are needing to heal from our surgeries. We did treat ourselves to a lovely 5 course dinner at the Como Conservatory.