The kitchen sink came with the granite and cabinets. We had to clean the old silicone. This is a picture of the re-siliconed and being held in place while it dries.

The kitchen sink came with the granite and cabinets. We had to clean the old silicone. This is a picture of the re-siliconed and being held in place while it dries.
The first floor shower is tiled and ready for grout..Steven installed the ceiling boards.
The pedestal sink is installed in the second floor water closet.
The two dining room closets have been sheet rocked and painted.
I found the wallpaper for three walls at a thrift store. The fourth wall was painted a dark rose.
Staining old door jams and door stops. The jambs are wider than needed so we will need to rip them down and then restain.
We are reusing the original trim, much of which had been painted. I had earlier scraped off much of the paint and now I am sanding and staining.
The doors were designed to be bi-fold doors. I removed the hinges to create instead two separate doors that will open in the middle. The doors were light pine which I sanded and stained.
Steven finished mudding the closets. Now to let them dry for sanding.
The dining room closets (coat and pantry) are drywalled and ready for mudding.