Final Inspection

We had the building inspection today. Everything is approved. There are still a few details for the crew to complete but today they removed all the scaffolding. We dug up three bushes on the south side of the house because they will be in the way for the gas line installation. The Bridal Wreath was large and became about 6 different bushes. I planted them along the east (back) lot line for privacy.img_2694-1

Bay Window Shed Roof Removed

The bay window walls stick out above the shed roof. We decided to take off the shed roof on the 12′ bay window section. Steven will install a temporary roof for the winter while we take time to decide what style roof to reinstall in the spring. We want to let more light into the dining room and have the bay window itself more visible.

Bay roof sticking out of shed roof
Bay roof sticking out of shed roof
img_2703
Shed roof removed

Last Details

The carpenters are adding last trims, painting touch-ups and added a LVL (microbeam) between the first and second floors to allow installation of a long narrow window above the south kitchen cabinets and to replace the window we took out shown in the second picture with black plastic covering the opening.

 

img_2659

 

img_2660

 

Dormer insulated Exterior Siding

I insulated the dormer. Fiberglass on the walls and layers of polystyrene under the roof. I spray foamed the cracks. It was an awful job. It got all over my hands. I will leave further jobs to Steven!

Dormer insulation
Dormer insulation

 

 

 

 

 

 

 

I painted the shakes a shade darker than the darkest trim – closest to the roofing. It was satin paint but turned out glossy. We like the color but not the gloss.

img_2652

 

The siding is finished! They are now working on the window trims.

 

img_2659img_2660