Two Projects in One Week

The city has been urging us to remove the old shed.  We wanted to remove it also but was using it to store windows.  We cleaned out the kitchen porch, removed a dividing wall and moved the windows there.  We tried for several days to find someone to take it.  There were many interested by most had no way to remove it so we decided to just demolish it.

What an improvement!

Old Shed
Old Shed
Shed Gone
Shed Gone
Back of shed
Back of shed

IMG_2214

Clearing the Porch

We had been using the front open porch as a storage area.

It was time to clean it up. First task was organizing the maple flooring for an upstairs bedroom.

Maple flooring for upstairs bedroom
Maple flooring for upstairs bedroom
Maple flooring
Maple flooring

 

 

 

 

 

 

 

Steven had rescued it from a gymnasium many years before.

We also organized the free railing materials we had gotten from a ReUse store.

Spindles for Railing
Spindles for Railing
Railing for porch
Railing for porch

Airlock Begone

At sometime an exterior door had been added to the living room and an airlock built in front of it on the porch.  We wanted to remove the airlock and change the door into a large window which we had picked up from a house being remodeled.

Original porch with airlock
Original porch with airlock
IMG_2181
Pella window 71″ X 63″

 

 

 

 

 

 

 

 

Airlock
Airlock

The window was two double hung sections, bronze metal on the outside and wood on the inside.

 

 

 

 

 

 

 

 

 

Siding from Airlock
Siding from Airlock

We carefully removed the siding from the airlock so we could use it later (below the siding is maple flooring.)

 

Steven surveying our accomplishments
Steven surveying our accomplishments
Airlock removed-Living room door
Airlock removed-Living room door

 

 

 

Front wall of the airlock removed and the side wall is in process of being removed.

We will use this door in the kitchen porch as the exterior door.

 

 

Door and airlock removed
Door and airlock remove

The airlock, door and tile on the floor are gone.

We still need to remove the siding to the right.

 

 

Framing for window
Framing for window

 

 

 

Inside looking out
Inside looking out

 

 

 

 

Gutting goes on

IMG_2024
Bedroom looking toward bathroom

We turned our attention to the first floor and removed plaster and lathe.  We have filled 5 Bagsters so far.

Bagsters
Bagsters

 

 

 

 

 

 

We applied for our building permit – it took over 4 weeks for approved.  Many blueprint changes in the last weeks.  We have removed all the tile on the wood flooring.  We will have natural wood floors throughout the first floor (only exception is the bathroom).  It has been dirty itchy work.

Living Room