Stairway completed

Steven had constructed a platform over the stairway so  we could insulate it and keep the cold from flowing up. He reinforced it so we could stand on it to sheet rock the ceiling and walls.

Stairway platform and sheet rock in process
Stairway finished as well as around oval window

 

 

 

 

 

 

 

 

 

 

 

 

 

 

We continued on to the hallway and entrance to north bedroom.

Hallway and doorway to north bedroom

We then completed the sheet rock in the north bedroom – the west street wall and the wall separating this bedroom and the middle room. We wanted to isolate this room so we would not have to heat it. It did make a difference!

West wall of North Bedroom

We went back to the South Bedroom and completed the West street side.

West wall of South Bedroom

While Steven was working elsewhere, I went around and installed the electrical boxes.

 

Electrical Box

Sheetrock beginning

We have the 2″ insulation installed in almost all of the second floor. It is temporarily installed in the bathroom because we need to install venting and plumbing. We received permission to do our work non-linearly.

 

2" polystyrene insulation

We started hanging sheetrock in the south bedroom. It was not as easy as we could have hoped. The polystyrene covering up the studs makes it a bit haphazard. It will be slow going.

First sheetrock installation