I’ve been painting windows. Steven is working in the basement – disconnecting the water heater, the boiler, and the oil tank. The first 6 pieces of metal roofing went up today. Yaah!
Exterior
Day 15 Fascia Trim
Day 13 & 14 North wall siding and corbels
The siding is installed on the north wall. The window frame is installed – we are still working on restoring the windows themselves. Corbels are on each corner of the wall to support the roof.
Day 12 Rotted Area in North Porch Roof & New Sidewalk
We found that there was a leak in the north porch. Our dedicated carpenters opened the roof up and found extensive rot. Lindsey cleaned it up and did this lovely patch. I used the last of the driveway pavers to construct a sidewalk to the front porch.
Day 11 Second Story Fascia
Slow day at Rose Cottage – I painted 2 x 6’s for the second floor fascia
Day 9 Roof covered
Day 9 Brian and Gabe worked until 9 p.m. to finish covering the roof and making it water tight. Thank you!
Day 8 Second Story Interior