We have the 2″ insulation installed in almost all of the second floor. It is temporarily installed in the bathroom because we need to install venting and plumbing. We received permission to do our work non-linearly.
We started hanging sheetrock in the south bedroom. It was not as easy as we could have hoped. The polystyrene covering up the studs makes it a bit haphazard. It will be slow going.