Porch Roof in Process

The kitchen roof has OSB installed and is covered with a tarp.Steven has removed the shingles from the north porch. He had to do repairs on part of the open porch roof. The roof over the bay window has taken some time as it needed a different design to go over the taller walls of the bay.

Tarped roofs
Trying out placement of cupids

New Steps and Landing

Steven dug the holes for the cement footing by hand and then mixed and poured the cement into purchased forms. We had on hand all the other materials. The steps were from a Menards clearance. I then applied red mahogany oil.

Smoothing the cement top on first footing

Siding and steps finished except for railing

New color for door and trim