Last Details

The carpenters are adding last trims, painting touch-ups and added a LVL (microbeam) between the first and second floors to allow installation of a long narrow window above the south kitchen cabinets and to replace the window we took out shown in the second picture with black plastic covering the opening.

 

img_2659

 

img_2660

 

Leave a Reply