The kitchen joists are finished so on to the bathroom. We removed two 2×6 joists to make a hole in the bathroom floor/ceiling. Large enough to use the hoist to raise our antique claw foot bathtub. It is on a 4 wheel platform so we can wheel it around until we are ready to install it. We also lowered one radiator to use in the kitchen and raised 3 radiators to use in the two bathrooms and hall. Our plumbing contractor stopped to answer a few questions. He’ll come again after we get the new 2×8 joists in the bathroom floor. It has been very hot (90) so I installed blinds over the south and west windows.