We had installed new joists in the bathroom ceiling/floor using a level but they didn’t turn out level! We discovered we needed to do work in the basement! Plumbing had cut through one joists leaving it to sag another joists was splitting and weak. Before we could do the repairs, Steven had to remove large sewer pipes and electrical wiring. He then had to do rewiring so we would still have some electricity. While he did that I cleaned and organized. Steven also went through supplies stored in the basement into plumbing and electrical. I went through our lights and chose glass globes for the five fans we will install.
We also needed to add joist hangers at one weak spot and install a 4 x 4 to reinforce another.