The north bedroom and the dormer 2″ insulation, taping and ceiling dry wall are finished except for foaming the cracks.
Steven built a wood floor over the stairway and we installed the ceiling. Wish I had remembered to take a photo of the process. The bathroom ceilings are temporarily insulated and we have just a couple smaller pieces of dry wall to install. Then on to foaming the cracks in the 2″ insulation and an inspection before we install the wall sheet rock. The electric heater is keeping us warm but is a bit expensive.