We finished the ceiling dry wall in the bedrooms. It is getting cold outside, so to keep us warmer we decided to insulate the attic to R60 over the bedrooms. We used 10″ R30 4′ batts. Over the south bedroom, Steven had to lay on his back to install! It took one full day to do. We used the loose insulation we had saved from the gutting for that area and to insulate the eaves. We still have ceiling dry wall to install in the hall and over the stairway. The bathrooms have to wait for the plumbing.