Installing the LVL to bring open porch up to code.

The open porch was not up to code – to do so we needed to install a double 2×8 LVL. We decided to go from the end corner of the kitchen porch to the corner of the north porch. A total of 40’.

First 24’ LVL installed

LVL in storage at Menards
May 29

Using the ladder to support LVL in installation


Metal support posts

Leave a Reply