Installing the LVL to bring open porch up to code. Artis Porches May 30, 2021June 20, 2021 0 Comment The open porch was not up to code – to do so we needed to install a double 2×8 LVL. We decided to go from the end corner of the kitchen porch to the corner of the north porch. A total of 40’. First 24’ LVL installed LVL in storage at Menards May 29 Using the ladder to support LVL in installation Metal support posts Share this:Click to share on Twitter (Opens in new window)Click to share on Facebook (Opens in new window)Like this:Like Loading... Related