
Day 1 Crew begins removing the roof down to the 2′ 7″ kneewalls. First day almost completed over bedroom 2. Window is a triple window Steven and I removed to repair and insert back into the north wall of bedroom 2.



Day 1 Crew begins removing the roof down to the 2′ 7″ kneewalls. First day almost completed over bedroom 2. Window is a triple window Steven and I removed to repair and insert back into the north wall of bedroom 2.