Day 2 Second Story Raising

The kneels are cleared above. Shingled roof to the right will remain as a gable. The second story had to be covered with tarps at the end of each day to protect the contents of the first floor.

Day 2
Day 2
Day 3 Second story cleanup
Day 3 Second story cleanup
Steven cleaning up and covering triple window
Steven cleaning up and covering triple window
Day 2
Day 2

Leave a Reply