Appliances in water closet

The towel warmer radiator was installed in the tub room on the second floor.
We hired the installation of drywall and mudding for the first floor.
We had an Art Deco medicine chest that we installed into the drywall installation of the first floor bathroom. The sink and cabinet were purchased at the ReStore.
We renting a small edge sander, Steven sanded the dining room area for the breakfront alcove and closets and the bedroom alcove and closets. We can then build the 2 x 4 walls.
To waterproof the shower we installed Durock and Permabase. We will be installing ceramic tile.
We installed the insulation behind the shower install and were then ready to install the actual base. Steven is screwing it securing to the walls.
The door is an original door that has been stripped of paint and restored.