Day 3 Roof Removed and Siding Painted

The roof is totally removed except for far South gable which will be used to support the tarps overnight.

I painted the edges of the siding, then we spread them all out so I could spray paint them. Our sprayer was working poorly so we purchased a new one and it was so much better. So far rain has not been a problem.

 

Day 3 Roof removed except for far south end
Day 3 Roof removed except for far south end
Day 3 Open on Second Floor
Day 3 Open on Second Floor
Day 3 Artis painting the edges of the siding
Day 3 Artis painting the edges of the siding
Day 3 Siding spread out for painting
Day 3 Siding spread out for painting