Chimney Removal Continued

After removing the chimney from the second floor, we decided to continue removing it in the kitchen so we would have better kitchen efficiency. Steven swung a sledge hammer from the hole in the second floor. he antique bricks are gone from the house to a pile outside. This time Steven removed the bathroom window and we threw the bricks out that space. We have a large pile of bricks now.

Worn out from swinging sledge hammer

Let the Light Shine In

While Steven worked on the electricity, I worked on the window that will be installed above the south kitchen cabinets. I framed and window wrapped it. I need to add wood across the top and then we can install it. It will give wonderful warm sun in the winter. We had removed a window earlier below it. We will need to patch it next spring with pieces of lap siding. The strip above the window is tar papered. We are thinking of putting in decorative shakes.