The hallway radiator hangs on the wall using a bracket.

The hallway radiator hangs on the wall using a bracket.
I am scraping as much adhesive residue off the floor as possible before future sanding.
The seams have fiber tape and now Steven is sealing with thin set in preparation of waterproofing. He also caulked the outer edges.
After Steven restored the leaded window, I installed and trimmed it with original trim.
We sorted the baseboard trim (after restoration) and installed baseboard, top piece and quarter round in the corner so the radiator could be slid in. We are working to get radiators in place so the heating system can be completed
I thought the paint color for the north bedroom would work with the wallpaper. I decided it didn’t so I mixed paint from several colors to get the color I wanted. I am much happier with the color. The color matches the bedspread now.
we had purchased a set do bi-fold doors from ReStore. I separated them by taking the hinges off. We are deciding how to place the door before framing the wall.
The kitchen door into the dining room is trimmed with white trim matching the windows.