A Very Dirty Job

While Steven was under the porch, I rearranged the windows and door stored there and then removed the car siding on the ceiling and on the south wall. Needless to say, 80 or so years of dirt fell on my head (I was wearing goggles, mask, and a big brimmed hat. When I was finished, my hand were black with dirt.

Ceiling boards on left wall
Insulation and Dirt that fell
Discovered that the exterior siding had been installed directly on the studs with no sub boards underneath. I could see day light between the boards. We will have to remove the siding and installed 4 x 8 underneath.

Raising the Corner of the Kitchen Porch

We decided to raise the corner of the kitchen porch. First the jacks wouldn’t work, Steven finally found two that would work and went under the porch and discovered a rim joist was cracked and sagging. He had to jack that split up and sister a 2×8 board to it. He then was able to raise the corner 1 1/2″.

Jack raising the split rim joist
Sistered rim joist
Ready to be raised

Moving Steps

We had purchased a set of steps on clearance from Menards. We stored them in back of the house. We brought them out to the driveway to see how they would work with the new positioned kitchen door. They will eventually be turned to the side and a platform constructed for in front of the door. I moved pavers from other areas to form the sidewalk leading up to the stairs.

Trim in North Bedroom

While Steven was working on the electrical, I painted and installed baseboard trim in the north bedroom. We are using corner pieces to give a more vintage look. The great thing is there is no mitering. The baseboard trim was trim we found that someone was giving away. We are using this room to store furniture for the airbnb.